DETAIL PROGRESS KNMP

100
Lokasi Progress Bergerak
41.55%
Progress Nasional
0.37%
Rata-rata per Site
0
Site Selesai 100%
TREND PROGRESS NASIONAL
TOP KENAIKAN PROGRESS
Mattiro Bombang SULAWESI SELATAN
+79%
Lero Pinrang SULAWESI SELATAN
+75%
Limbua SULAWESI BARAT
+70%
Tadang Palie SULAWESI SELATAN
+69%
Punagaya SULAWESI SELATAN
+69%
Terapung SULAWESI TENGGARA
+68%
Tamarupa SULAWESI SELATAN
+67%
Lumpue SULAWESI SELATAN
+66%
Bontorannu SULAWESI SELATAN
+65%
Takkalasi SULAWESI SELATAN
+65%
Data SULAWESI SELATAN
+70%
Arungkeke Pallantikang SULAWESI SELATAN
+64%
Watolo SULAWESI TENGGARA
+65%
Bungeng SULAWESI SELATAN
+63%
Lasama SULAWESI TENGGARA
+63%
RANKING PROVINSI
Provinsi Total Site Avg Completion Hub Penyangga
SULAWESI TENGGARA 15 52.33% 4 11
SULAWESI SELATAN 50 50.54% 7 43
SULAWESI BARAT 6 45.33% 0 6
SULAWESI TENGAH 14 44.50% 2 12
GORONTALO 11 36.09% 1 10
SULAWESI UTARA 15 0.53% 3 12
TOP 10 PROVINSI
ProvinsiAvg Completion
SULAWESI TENGGARA 52.33%
SULAWESI SELATAN 50.54%
SULAWESI BARAT 45.33%
SULAWESI TENGAH 44.50%
GORONTALO 36.09%
SULAWESI UTARA 0.53%
DISTRIBUSI PROGRESS NASIONAL
0%
11
1-25%
12
26-50%
42
51-75%
45
76-99%
1
100%
0
PROGRESS TERBARU
Tasiwalie
SULAWESI SELATAN

17% Pekerjaan DPT dan Pembesian
* Pek. Pengecoran tapak dinding penahan tanah dan perakitan bekisting * Fabrikasi pembesian
2026-09-12 18:51:00
Takkalala
SULAWESI SELATAN

22% Pek. Penimbunan Dan Perataan Tanah
* Pek. Penimbunan Dan Perataan Tanah
2026-09-12 16:29:00
Tubo Poang
SULAWESI BARAT

4% Pekerjaan Pagar Pengaman dan Mobilisasi Material
* Pek.pagar pengaman * Pek. mobilisasi Material
2026-09-12 16:13:00
Lero Pinrang
SULAWESI SELATAN

28% Pekerjaan DPT, Pabrik Es, Docking Perahu, dan Bangunan Genset
* Pek. Pengecoran tapak dinding penahan tanah * Pek.Lantai kerja bangunan pabrik es,dan bangunan docking perahu * Pek. Pasangan batu kosong bangunan genset * Pek. Pembesian besi ringbalk untuk bangunan tangki air * Pek. Penimbunan tanah
2026-09-12 15:45:00
Takkalala
SULAWESI SELATAN

22% Penimbunan Lokasi
Penimbunan Lokasi
2026-09-12 10:23:00
Sienjo
SULAWESI TENGAH

23% Pek Pabrik Es
- Bangunan pabrik es portable - Pek lantai beton
2026-09-12 10:21:00
Lampenai
SULAWESI SELATAN

18% Pekerjaan Persiapan
- Pek. Pengukuran elevasi - Pemasangan patok batas
2026-09-11 19:45:00
Karang-karangan
SULAWESI SELATAN

26% Pekerjaan DPT
* Pekerjaan Pemasangan pembesian DPT * Pekerjaan Perakitan Bekisting DPT
2026-09-11 19:42:00
Pallameang
SULAWESI SELATAN

25% Pekerjaan DPT, Saluran dan Pembesian
* Pek.Bekisting dinding penahan tanah * Pek.Pembesian besi beton dinding penahan tanah * Pek. Pemasangan batu bela dan Plesteran dinding saluran * Pek. Fabrikasi Pembesian
2026-09-11 19:35:00
Benteng
SULAWESI SELATAN

5% Pekerjaan Pembesian
•perakitan pembesian pondasi tapak.
2026-09-11 19:32:00
DETAIL SITE
Site Provinsi Status Completion Updated
SITE00081
Mattiro Bombang
SULAWESI SELATAN PENYANGGA 79% 2026-11-24 09:49:12 Lihat Site
SITE00096
Lero Pinrang
SULAWESI SELATAN HUB 75% 2026-11-25 10:54:03 Lihat Site
SITE00009
Limbua
SULAWESI BARAT PENYANGGA 70% 2026-11-24 11:26:41 Lihat Site
SITE00125
Hutakalo
GORONTALO PENYANGGA 70% 2026-11-25 10:49:14 Lihat Site
SITE00157
Data
SULAWESI SELATAN PENYANGGA 70% 2026-11-25 11:06:12 Lihat Site
SITE00016
Punagaya
SULAWESI SELATAN PENYANGGA 69% 2026-11-25 12:51:08 Lihat Site
SITE00160
Tadang Palie
SULAWESI SELATAN PENYANGGA 69% 2026-11-25 11:42:54 Lihat Site
SITE00134
Terapung
SULAWESI TENGGARA HUB 68% 2026-11-25 09:15:28 Lihat Site
SITE00101
Tamarupa
SULAWESI SELATAN PENYANGGA 67% 2026-11-25 09:58:01 Lihat Site
SITE00124
Kasia
GORONTALO PENYANGGA 67% 2026-11-25 10:50:19 Lihat Site