DETAIL PROGRESS KNMP

100
Lokasi Progress Bergerak
41.55%
Progress Nasional
0.37%
Rata-rata per Site
0
Site Selesai 100%
TREND PROGRESS NASIONAL
TOP KENAIKAN PROGRESS
Mattiro Bombang SULAWESI SELATAN
+79%
Lero Pinrang SULAWESI SELATAN
+75%
Limbua SULAWESI BARAT
+70%
Tadang Palie SULAWESI SELATAN
+69%
Punagaya SULAWESI SELATAN
+69%
Terapung SULAWESI TENGGARA
+68%
Tamarupa SULAWESI SELATAN
+67%
Lumpue SULAWESI SELATAN
+66%
Bontorannu SULAWESI SELATAN
+65%
Takkalasi SULAWESI SELATAN
+65%
Data SULAWESI SELATAN
+70%
Arungkeke Pallantikang SULAWESI SELATAN
+64%
Watolo SULAWESI TENGGARA
+65%
Bungeng SULAWESI SELATAN
+63%
Lasama SULAWESI TENGGARA
+63%
RANKING PROVINSI
Provinsi Total Site Avg Completion Hub Penyangga
SULAWESI TENGGARA 15 52.33% 4 11
SULAWESI SELATAN 50 50.54% 7 43
SULAWESI BARAT 6 45.33% 0 6
SULAWESI TENGAH 14 44.50% 2 12
GORONTALO 11 36.09% 1 10
SULAWESI UTARA 15 0.53% 3 12
TOP 10 PROVINSI
ProvinsiAvg Completion
SULAWESI TENGGARA 52.33%
SULAWESI SELATAN 50.54%
SULAWESI BARAT 45.33%
SULAWESI TENGAH 44.50%
GORONTALO 36.09%
SULAWESI UTARA 0.53%
DISTRIBUSI PROGRESS NASIONAL
0%
11
1-25%
12
26-50%
42
51-75%
45
76-99%
1
100%
0
PROGRESS TERBARU
Padang Kalua
SULAWESI SELATAN

26% Pekerjaan Pondasi
* pengecoran kolom pondasi tapak
2026-10-05 20:35:00
Tanjung Laimeo
SULAWESI TENGGARA

37% Pekerjaan DPT, Tangki Air dan Tambatan Perahu
= pek. DPT = pek. Tangki air = pek. tambatan perahu
2026-10-05 20:32:00
Darubiah
SULAWESI SELATAN

17% Pekerjaan Levelling Lahan

2026-10-05 20:00:00
Tubo Poang
SULAWESI BARAT

20% Pekerjaan DPT
•pek.bekisting •pek.pengecoran DPT
2026-10-05 19:46:00
Tirowali
SULAWESI SELATAN

36% Pekerjaan Rumah Genset, Shelter Pendaratan Ikan dan Kantor Pengelola
-pekerjaan acian dinding bangunan kantor pengelola dan bangunan rumah genset -Pekerjaan Pengecoran balok praktis di bangunan rumah genset -Pekerjaan tral enterence pondasi rolak bata di shelter pendaratan
2026-10-05 19:39:00
Binanga Karaeng
SULAWESI SELATAN

29% Pekerjaan DPT, Tambatan Perahu dan Precast
* Pek. Pengecoran dinding penahan tanah * Pek. Tambatan perahu * Pek. Pemasangan bekisting kolom precast * Fabrikasi Pembesian
2026-10-05 19:39:00
Watolo
SULAWESI TENGGARA

35% Pekerjaan Tambatan Perahu

2026-10-05 19:10:00
Data
SULAWESI SELATAN

29% Pekerjaan Kios Perbekalan, Tambatan Perahu dan Pembesian
* Pek. Plesteran dinding bangunan kios perbekalan * Pek. Tambatan perahu * Pek. Pembesian besi ringbalk/RB-1 tambatan perahu * Fabrikasi Pembesian
2026-10-05 18:30:00
Benteng
SULAWESI SELATAN

20% Pekerjaan Shelter Pendaratan Ikan
* pengecoran lantai kerja Selter pendaratan ikan
2026-10-05 18:19:00
Sumpang Binangae
SULAWESI SELATAN

2% Pekerjaan Persiapan

2026-10-05 17:58:00
DETAIL SITE
Site Provinsi Status Completion Updated
SITE00159
Waetuoe
SULAWESI SELATAN PENYANGGA 53% 2026-11-25 12:01:08 Lihat Site
SITE00029
Bassiang Timur
SULAWESI SELATAN PENYANGGA 52% 2026-11-17 09:19:51 Lihat Site
SITE00024
Padang Kalua
SULAWESI SELATAN PENYANGGA 52% 2026-11-24 10:06:47 Lihat Site
SITE00054
Lakawali Pantai
SULAWESI SELATAN PENYANGGA 52% 2026-11-23 17:37:09 Lihat Site
SITE00099
Pallameang
SULAWESI SELATAN PENYANGGA 51% 2026-11-25 09:46:39 Lihat Site
SITE00023
Karang-karangan
SULAWESI SELATAN PENYANGGA 51% 2026-11-20 09:30:50 Lihat Site
SITE00062
Sienjo
SULAWESI TENGAH PENYANGGA 50% 2026-11-25 09:49:34 Lihat Site
SITE00007
Bababulo
SULAWESI BARAT PENYANGGA 50% 2026-11-25 09:50:06 Lihat Site
SITE00144
Tanjung Pinang
SULAWESI TENGGARA PENYANGGA 49% 2026-11-12 10:04:55 Lihat Site
SITE00025
Tirowali
SULAWESI SELATAN HUB 49% 2026-11-24 09:51:21 Lihat Site